Posts

What are Multi page Applications

 Multi-Page applications are created using traditional approaches. It requires a page reload. Advantages: More Secure SEO Scalable

What are Single Page Application

 Single-page applications are the modern method of app creation. These apps are accessed from the browser and don't require a page load while using. Advantages Faster Development code reusability performance easy maintenance

What is a Framework

 The framework makes developers easy by generating boilerplate code and providing the required tools(libraries) for development. Developers can put more focus on logic and framework takes care of skeleton Example : SPFx

What is a Library

 The library provides a set of functions for the program and it can be used at multiple places. The new features can be added to the programs easily example: Jquery

What is an API

 APIs are mechanisms that are unable multiple software components to communicate with each other using a set of definitions and protocols

Manoharabad Kothapalli Railway line Latest Updates || మనోహరాబాద్ కొత్తపల్లి రైల్వేలైన్

Image
#Manoharabad to #Kothapalli 151 KM Railway Line was sanctioned in 2016. This project is being executed in 5 phases. As of this moment, 2 phases of 41 KM construction was completed. It provides a direct rail link between #Hyderabad & #Karimnagar Phase – 1: #Manoharabad-Gajwel (31 km) Phase – 2 : #Gajwel – Kodakandla (10 km) Phase – 3 : #Kodakandla – Siddipet (34 km) Phase – 4  : #Siddipet – Sircilla (37 Km) Phase – 5    : #Sircilla – #Kothapalli (39 km)

Pamarru Palakollu National Highway 165 || పామర్రు పాలకొల్లు జాతీయ రహదారి 165 || PP Road

Image
National Highway 165 (NH 165) begins at #Pamarru and ends at #Digamarru ( #Palakollu ) road #PPRoad. It has a total length of 107.40 km. The government has decided to expand this road to 2 lanes with paved shoulders in two phases.  Status: Land acquisition and Alignment Finalization  Approximate Length: 107 KM Estimated Cost: 529.54 cr (Phase 1) + 450 cr (Phase 2) Width: 2 Lane Expansion with paved shoulders The project has been divided up into 2 phases  Phase - 1 : Pamarru to Akividu - 64 KM Phase - 2 : AKividu to Digamarru - 46 KM